CaliberERPBuilt for the manufacturers big ERP forgot.
One system from quote to crate — sales, planning, production, quality, traceability and shipping, running on your own server.
Every screen below is the real product · founding beta open
The problem
You know this factory.
The order lives in a spreadsheet.
The revision the shop floor is building may or may not be the one sales promised. Nobody is sure. Everybody is careful.
The knowledge lives in Dave.
Which supplier's batch went into which unit? Dave knows. Dave is on holiday. The auditor is not.
The evidence lives nowhere.
When the audit letter arrives, the next two weeks disappear into assembling a story the system should have been writing all along.
The reveal
This is your factory on CaliberERP.
One dashboard, first thing in the morning: on-time rate, first-pass yield, what needs attention and who owns it. Every number clicks through to its answer.
CH 01 · Win
Win the work.
Pipeline to quote to confirmed order — every promise you make starts its paper trail here, in the same system that will build it.
CH 02 · Plan
Promise dates you can keep.
The planning workbench pulls demand, shortfalls and capacity into one screen — so the date you give a customer is a calculation, not a guess.
CH 03 · Buy
Buy with your eyes open.
Requisitions carry their own intelligence: value in play, overdue lines, need-by pressure — summarised above the table, before you scroll a single row.
CH 04 · Make
Run the floor in real time.
OEE gauges, a live health cockpit and a kanban the shop floor actually drags — production stops being a rumour and becomes a screen.
The andon moment
When the line stops, the right people know in seconds.
A problem at the workstation raises an andon call. It escalates until someone owns it, the floor screens show it, and the response time goes on the record — no walking to the office, no problem that quietly waits until Monday.
CH 05 · Assure
Quality that proves itself.
Non-conformances with turnaround analytics, first-article inspections with ballooned characteristics, SPC charts — evidence generated as a by-product of working.
CH 06 · Trace — the crown jewel
Scan a serial.
Know its whole life.
Every unit carries a passport: every component, batch, supplier lot and subcontracted operation behind it. And when the auditor asks, you print the complete Build History File — one PDF, one click.
The Build History File walkthrough — serial to genealogy to printed file, recorded in the product.
CH 07 · Store & Ship
Nothing lost. Nothing late.
Stock with value, status and expiry pressure summarised above every table; inbound deliveries ranked by lateness; outbound tracked to the carrier.
CH 08 · Govern
Audit-ready is the resting state.
An ISO 9001 document register, compliance evidence packages, safety-critical flags — the paperwork an auditor wants, maintained by the system while you work.
Runs on your server. Full stop.
Your data lives in your building, under your backups and your rules. No cloud dependency, nothing that stops working when the internet does — and a guided installation that has you running in an afternoon, not a quarter.
# guided installation
$ caliber setup
✓ database provisioned
✓ services running
✓ shop-floor stations connected
ready — same afternoon.
CH 09 · See
Every number clicks through to its answer.
Dashboards for operations, quality, inventory and spend — and none of them is a dead end. Late deliveries at 4%? Click it: these orders, these suppliers, these dates.
A tour through the dashboards — recorded in the product, plays while you watch.
CH 10 · Personalize
Make it yours.
Six themes — dark or light, each in three colour schemes. Tables with columns you choose, a sidebar that folds away, display preferences that persist per user. And configuration lives in one organized settings hub with a guided getting-started checklist — not a consultant engagement.
You're never lost
A Help Centre that knows your job.
Built-in, step-by-step guides for every module — each one labelled by role, so operators, supervisors and buyers see exactly their part. Every guide says where it fits in the flow, how to do it, and answers the questions that come with it.
One system. Ninety-six screens deep.
Quotes, purchasing, receiving, inspection, subcontracting, assets, warranty, complaints — the grid below cycles through every screen in the library:
The grid cycles through the full library — all 96 screens. Click any tile to expand it.
Upcoming builds
And this is the slowest it will ever be.
Supervised sign-off approvals. Confirmed dates on every commitment. An NCR decision cockpit. Reports you build yourself. That's the real forward queue — plus planned add-on capabilities beside it.
See what's coming →The invitation
In active development. Recruiting founding beta testers.
Everything above is real and running. What it needs now is real factories using it hard and saying what's missing. Apply with the tier that fits you — approved testers run their requested tier free:
0 mo
free licensing
0 mo
extension on request
0
roadmap, shaped by you